Items tagged with automatic

Feed

I'm doing an interactive component and i need to plot a function and some points (which can change).
My question is if is it possible display the graphic with a value of automatic Plot Ranges.
For example the graphic would started with the first point and finisched with the last, like in this image (but i did it manually).

I want a sort of autozoom.

How do I make maple to show the values of my variables in my calculation automatically? I want it to look somewhat like this:

https://gyazo.com/df9fe1193091fb771ff99d6187c9195f

Instead of this:

https://gyazo.com/936894920a6cb89082fb94d66f8e4291

 

Having solution of an inequations system, is there a way/function/algorithm to find a particular numeric solution (as simplex[minimize] can do) ?

ex:

Q := {1 < x - y, x + y < 1};

R := solve(Q);

      { x < 1 - y, y < 0, y + 1 < x }

manually it's easy to find some numeric solutions:


      y = -1, x = 1
      y = -2, x = 0

but I need an automatic way.

Thank you for your help
s.py

 

Hi -

 

    It is often useful useful to generate two procedures --- one to evaluate a function and one to evaluate its gradient.  The procedure codegen[GRADIENT] does not treat functions of array variables.  Why doesn't GRADIENT support array variables?  Would it be possible to replace the array variables by variables, apply GRADIENT, and then replace the array variables by variables again?

 

Best wishes,

David

 

Hi

I have entered two functions and got a solotion for them:

Now i want to know if there is someway Maple can do this automaticly:

 

So that i not have to do like i did here, manuel copy-paste the values into the function, or re-enter them.

 

Using Maple 17.02 on Windows 64-bit, but i guess that makes no differance, since it's java :) 

 

Try makeing it simple, i'm new with Maple.

 

Thanks in advance!

Emil Kristensen

 

Does anyone know if you can schedual a task in maple ie at 12:00 add a number
to a matrix in a worksheet (Just an simple example to see if it is working)

In windows you can use the "Task Scheduler" to automate stuff that you need to repeat.

Also I dont want the actuall Maple software to actually launch at 12:00, I want everything to happend
in the background.

If you put the maple commands in the "start up code region" of the worksheet I guess it

Page 1 of 1